KEY FEATURES OF THIS PROJECT

HOTEL BARCELO TEGUISE BEACH

Renovation of a 4-star hotel in the exclusive tourist area of Lanzarote: Costa Teguise. This project comprised of 143 suites and 44 single rooms, with the following installations:

  • Plumbing installation (hot and cold water).

  • Installation of sanitation (sewage).

  • Installation of air conditioning.

Completion time: 10 months; Started October 2014.

SERVICES

Plumbing
Sanitation
Air Conditioning