Works carried out

GRAN CANARIA STADIUM

Opened in 2013, this multipurpose stadium has capacity for 32,000 people and is a venue for sporting, cultural and musical events. It is currently the home of the UD Las Palmas football team LFP – BBVA and has hosted international matches for the Spanish National Team. The works were extremeley complex in nature (cafeterias, locker rooms, toilets, parking, gym, activity rooms, games, etc.).

Works carried out:
  • Plumbing installation (hot and cold wáter).

  • Installation of sanitation facility (sewage and stormwater).

  • Installation of a network of Fire Hose Cabinets (FHC).

  • Installation of a network of Sprinklers (automatic sprinklers).

  • Installation of an irrigation system.

  • Installation of hydrotherapy pools.

 

Completion time: 18 months. Started July 2012.